one litre of shuttering oil how much area covered the
shuttering?
Answer Posted / krishna
1 liter will gives 4.2square meters.
Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
What is OSHA compliance?
What is the difference between Hinged and pinned in Column ends
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
Is there any course for billing available in Mumbai? If yes then please mail me the details..
What is zoning permit?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
What are segregation and bleeding?
what is m30 in concrete tiles
How to calculate Volume of Wet cement concrete for a specific grade?
How to hide dimensions in autocad?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
mean of NH4 pipe
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
wat would be the probable interview questions and GD topics for IOCL exam?