Answer / baadri
batteries in parallel increase the current rating...but the condition is that voltage of two batteries should be same.....
| Is This Answer Correct ? | 8 Yes | 0 No |
Answer / hari prasanth
Batteries connected in series:
Let us consider that we need to light a lamp of 24 V.
So we can use 4 six volt batteries which can be connected in series to constitute 24 V.(4 batteries * 6 V =24 V).
Advantage:
Batteries connected in series provide higher voltage with same capacity.
Batteries connected in parallel:
Consider the same scenario.
If four 6 V batteries are connected in parallel it will provide 6 V only.Also any any one is damaged (short circuited) it will become 0 V.
So it is mandatory to get 24 V battery.
Advantage:
Batteries connected in parallel provide same voltage but double capacity.
Posted by Hari Prasanth.G
| Is This Answer Correct ? | 1 Yes | 0 No |
What is the cause for a blown fuse in one phase of primery side(HV) of a three phase transformer( 4169v-460v) in the time of closing its supply breaker. There is no load on the secondery side of the transformer in this moment.
Brief difference btween aluminium & copper conductor
What is mean by vector group? For what purposes we doing vector group test in transformers?
define reactive power?
tell me some type of questions throught which i can prepare for exam and do my best
what is the difference b/w neutral and earth?what is the need of earthing and what are the different methods for earthing?
why capacotors burnt out
What is cable gland,why does use for?
What is the GNA & MNA in armature reaction of Dc Generator
what is the principle of tubelight ??? what is the function of starter and choke ???
wat's the procedure to take short circuit current for cable selection
We have 2 Nos. Transformer with the capacity of 2000KVA and 1250 KVA and currently using only one 2000KVA T/R during operational hours while non- operational hous 1250 KVA T/R also used to reduce T & D losses. Similarly, 2 capacitor bank of 500KVAR and 300 KVAR also installed to balance reactive power. Now problem is around 1000 KW load PF is not maintaning 0.99 as 350 KVAR capacitor is in healty condtion. Now the PF is maintain 0.95 to 0.96.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)