sir i want to know that in L & T construction can we do our
6 months training proggramme cum placement???????



sir i want to know that in L & T construction can we do our 6 months training proggramme cum pl..

Answer / Shashi Jyoti Gupta

It is not uncommon for large construction companies like L&T to offer training programs along with placements. However, specific policies may vary depending on the division and the location. I recommend visiting their official website or contacting their HR department directly for accurate information.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

concrete mix design for M 30 Grade

1 Answers  


WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10

1 Answers  


the coefficient of curvature for a well graded soil must be inthe guage 0.5-1 3-4 4-5 none

1 Answers  


What is the meaning of RCC NP3 Pipes

17 Answers  


What is the consumption of Brick in one meter cube both 6inch & 4inch thick

4 Answers  


plz send me civil q papers of hpcl

5 Answers   Shell,


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

1 Answers   First American Corporation, GS Infra, L&T, Real Sociedad,


how to calculate the steel for rcc slab? plz tell me the formula for calculating the steel?

36 Answers   ABC, AG Technologies, Artemis, DCL, Dodsal, Dream Space, FIRA, FWO, Government, HSCL, Isolux Corsan, IVRCL, JP Group, Kalindee Rail, Klassic Constructions, RDH, Shriram, Techno Electric and Engineering, URC Construction,


What is the density of Cement, Fly ash,20 mm aggregate, 10 mm aggregate and stone dust?

14 Answers   Amrapali, Egis, Himuda, Indramas, L&T,


how much bentonite powder mix in 1000ltr fresh water with detail.

1 Answers   C&C,


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

1 Answers  


What are the composition of a landfill?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)