what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answer Posted / karthik rajendren
The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.
| Is This Answer Correct ? | 24 Yes | 3 No |
Post New Answer View All Answers
What is need for setting limits?
How much cum. Brick work can do by 1 madon
What is horizon or horizontal mining?
What is rate of concrete surface rendering work per sqm
States some of the commonly used commands in cad software’s?
What is semirigid connections?
Basic questions of civil engineering
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
How are freeway bridges built?
what is labour consume factor in residential projects
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
Design a rectangular channel.
How much cement is require in one sqft area in a G+3 residential construction.
Explain what is Critical Path Method (C.P.M)?
What is the meaning of soil reinforcement?