what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answer Posted / deepak katyal
IST- 30 Minutes
FST- 600 Minutes
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
What is OSHA compliance?
at which depth the construction of tunnel is economical from cost and engineering aspect.
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
The definition of national highway
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
Where will be the maximum bending moment in a TEE Beam?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
what is total volume of ingredients used in concrete accordingly
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
though u r a civil engineer, y r u interested in tcs???
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
What does a construction cost covers and what does not?
what are the types of dimensioning?