What is the Allowable silt content of sand for construction
purposes?
Answers were Sorted based on User's Feedback
Answer / مص
The maximum quantity of silt in sand shall not exceed 8%.
| Is This Answer Correct ? | 6 Yes | 2 No |
Answer / lokesh kumar
percentage of silt in sand shall not exceed 6% by its volume(means the volume of sand )
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / bharath m,+91 9980644165
Mr.Lokesh Kumar
Your answer is Correct.
Thank you for sharing your answer with Allinterview.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / shanmuga kirubanandan.t
As per CPWD specfication
not more than 8%
block work =5%
plastering work =5%
| Is This Answer Correct ? | 0 Yes | 0 No |
weight rcc m30
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
Why we use pcc in foundation?
why in india readymade structure is impossible in residence houses?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
Concrete Mix designs for M15,M20,M25,M30 and M35
23 Answers Arelgee Consultants, ATCO, Fusion, Gammon, Power Cable, Raushan Engineers, Simplex,
How to calculate cut length of square shape stirrups?
Respected Sir, I am from a hilly place called Darjeeling ,I have constructed house of 9 column out of which 4 of the column is under water , i have put rcc slab on top and on top of the rcc slab i have construced two room house with bricks and light roof , now i am planning to change the light roof with rcc slab for the two room, my main concern is will the column under water will hold the load of the new rcc slab coz it already 10 to 12 yrs old , i dont know what to do , can u advice me regarding this matter, weather to leave the upper floor roof light or make it rcc slab.(If i put the slab , it will require 45bags of cement and u calculate how much of steel and sand and pebbles) thanks with regard Anand
What tor stands for in tor steel?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)