What is the Allowable silt content of sand for construction
purposes?
Answer Posted / lokesh kumar
percentage of silt in sand shall not exceed 6% by its volume(means the volume of sand )
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
it is possiblee to produce concrete with out cracks...
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is difference between code and standard and specification?
how i convert mm into standard wire guage (SWG)no.
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
What is need for setting limits?
what is idealized curve for concrere and steel
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
How to come 1.54 from dry to wet concrete?
what is civil all interview questions
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
what is floating slab foundation?