What is the Allowable silt content of sand for construction
purposes?
Answer Posted / shanmuga kirubanandan.t
As per CPWD specfication
not more than 8%
block work =5%
plastering work =5%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the difference between yeild strength and compressive strength of steel???
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
In cement concrete how to check a quality of material also proportion of material at site ?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
Can inverted beams used in pipes during construction?
how to preaper for interview wat they asked in interview give me idea
What are the common ways of demolition?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
how to identify the failure of building by expansive soils
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing