What is the Allowable silt content of sand for construction
purposes?
Answer Posted / shanmuga kirubanandan.t
As per CPWD specfication
not more than 8%
block work =5%
plastering work =5%
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Which ratio use for cement selery???
what is differences between ferrock and concrete ?
how much required strength of cement concrete bricks(size 230x115x75mm)
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
Explain what is 1/8 on the architect ruler denotes?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
what radial pressure, the NP2 class rcc pipe can sustain?
What is absolute pressure? How absolute pressure is calculated?
Explain soil analysis?
Why should you show Client/Engineer activities clearly on the project plan?
what is relation between SPT N value and driving piles after conducting a soil test?
Which architectural movement is also known as jazz moderna?
What are the uses of alloys in daily life and how are alloys made?
What is the name of this multiplication factors ?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?