How to calculate strirubs hook length?
one of my friend said unit of steel*dia of steel*no of bend=hook length
is correct r wronge
Answers were Sorted based on User's Feedback
Answer / pranav panchal
strirubs hook lengths generally depends upon the dia of steel
But as per IS codes
We can adopt one thumbrule
hook length = 10 d
where d is the dia of the steel
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / sjtbehera
No it is not correct. You may calculate or adopt thimb rule. You may take 9d 45 degree bend and 16d in 90 degree bend.
| Is This Answer Correct ? | 0 Yes | 3 No |
10. Do you remain in good relationship with your previous employer / company where you no longer work /?
How many kilo of binding wire required for one ton of reinforcemet steel binding?
17 Answers ECCI, L&T, Shri Janani Homes,
say the propotions of different concrete mix desidn(M20 M15 M25 M25 M30)
What is meant by solid geometry?
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
tmt steel
when does sedimentation occur before filteration, along with it, along with chlorination, after chlorination?
What is the difference between shear and tensile strength?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
what is the sp.gravity of sand?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)