Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


tmt steel

Answers were Sorted based on User's Feedback



tmt steel..

Answer / nanthakumar.c

THERMO MECHANICALLY TREATED BARS

Is This Answer Correct ?    16 Yes 1 No

tmt steel..

Answer / saravanakumar.p

thermo mechanically treated steel

Is This Answer Correct ?    8 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?

0 Answers   L&T, Puravankara,


For 100 cu.m of solid block masonry in CM 1:6, 8" thick. Calculate no of blocks required...? Actually I got it as 1250 no's.. But in my material it is 1100 no's.. U guys plszz check & tell me the answer......

1 Answers  


I am constructing a house having 20' X 19' hall. Do I need to go for a concealed beam. any alternative please? Thanks if a design is provided.

5 Answers  


Which are the Steel tests ?

0 Answers  


RR masonry rate analysis

0 Answers  


What is the rate of earthwork excavation?

5 Answers   Tata Steel Limited,


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

0 Answers   Talib and Shamsi Constructions,


Difference between ton and metric ton

3 Answers   DHA, ECCI,


reinforcement slab, beam and column formulas?

0 Answers   SP,


Draw a neat sketch showing the 'throat' of a welding in a plate girder ?

0 Answers   Rites,


how can we design dia of rainwater pipes ? plez explain by using formula ?

1 Answers  


How to calculate labor requirement or requirement of labor projction for a proposed multistoried building for which quantities of different items of work has been already calculated stage wise ?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)