As per Kandal suggestions, we have implemented rolling
starts on 140 (+/- 5) degrees and we kept 3 rollars to
complete the rolling before falling 125 degrees and the
Aggregate AIV is below 22. But When the DBM bed is being
rolled 3rd high viabration, (Before 1 plain & low ,2 high
Viabrations), the aggregate is getting sharp edge agg.
projections are damaged. As the literature is said that,
the VG-30 Grade having better control the temp.
susceptibility than Penetration grade. if so we could not
get this problem at site. But we are facing on site. let me
know.
No Answer is Posted For this Question
Be the First to Post Answer
what is the requierd compressive strenth for m 20 grade concreat for 7 days?
in brick masonry,what are the types of bonds?where which type of bond is used?& why?Also what is header & closer?
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
what is th consuption of cement , sand in plastering for 15mm thick cm1:4,1:3
What is labour ratio for construction of residential buildings
name three materials used in drainage work
how much quantity a skilled labour and unskilled does Pcc per day, if ratio is(1:2:4)
whats the difference between young's modulus,stress and pressure.they have same unit
In which grade of steel the laping length required is more,Fe 415 or Fe 500 ? and why?
Define mirror?
Please tell me 1 Sqm Steel 14mm center to center .200,.200
what is flashing?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)