how we decide the thickness of slab
Answers were Sorted based on User's Feedback
Answer / nawal
It depends upon the type of support conditions, whether it
is simply supported, cantilever etc. with the help of span
to depth ratio the depth can be calculated approximately if
span of slab is specified.N
| Is This Answer Correct ? | 17 Yes | 2 No |
Answer / kunal raghuwanshi
it depends upon the building design and loads acting.
| Is This Answer Correct ? | 3 Yes | 0 No |
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what is smart building materials?
What is the percentage of wastage in steel reinforcement n how to control it?
explain water proofing in toilets and terrace
how many bricks,cement,sand of a 40*30*6 ft bowndry wall?
6 Answers Natco, NGO, OGDCL, SIL, Simplex,
Is Sugar a retardar or accelator or plasctizer?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Structural steel: For a thumb rule check in field, the allowable weight which can be hung down for 10mm dia mild steel rod, of yield value of 0, 25 KN/mm2 and applying a factor of safety 2.00, will be how many kg?
how to calculate of m20 c.c road work 1cu.m
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
procedure to calulate the how much bag of cement is used for M20 grade?
how sir calculate the slab steel and sir i want to know that how i calculate shutter works payments in cum and the rate is 120 per cum
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)