What are the main reasons for conducting pull-out tests for soil nails?
No Answer is Posted For this Question
Be the First to Post Answer
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
what is mixed design, define it? what is way beecher?
How much will be Concrete required for one Sq.meter of area for building work?
2 Answers PSD, SMC, Tudor Infrastructures,
how new RCC roof joined with existing RCc roof
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
What is plasticiser and where it will use?
length where bent up is made in slab of bridge from one end
what is periode of deshuttering for different area of slab
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
what is mix design?
pls give the grads of concrete and the ratios to the same
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)