What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
No Answer is Posted For this Question
Be the First to Post Answer
during earth quake base shear force=a/w*g Comment?
What is Critical path in Ms-Project ?
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
7. Do you apply the skills and knowledge learnt at school in your work?
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
How to layout the site plot ? Method with explation
minimum dia of manhole cover should be A] 50 cm B ] 100 cm C ] 75 cm
what is the permanent solution applied for restoration of leaning tower of pisa?
what are the types of footing
how much dry volume of cement in 1cum in m20 grade
what is the nomimanal size' os agg.'for reinforced concrete 2 th ph value of water to be used in conc. Shall generly be
the capacity of water tank in liters if the diameter is 3m, and maximum height of water level as 1m.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)