y we need to take 28 days strength as compressive
strength ? y cant we take 30 th day
Answers were Sorted based on User's Feedback
Answer / ravi
In 28 days, concrete will gain its complete strength. After 28 days, you can take the strength on any day. You will get the same result. We need the results as early as possible. 28 days the minimum time it takes for the concrete to gain its complete strength. So, we take 28 day strength.
| Is This Answer Correct ? | 44 Yes | 3 No |
what are the cube & Sylinder strength of concret M20,M25,M30,M35,M40,M60 ,M75,M10 ,M15
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
Briks type
if column length is 12'(feet) then how to take ring bar on it?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
0 Answers Alfanar, Ancon, RAZ,
what is the bearing capacity of hard rock
i need the how much materials are needed for cubic feet of concrete?
technical name of shuttering plywood
what is the diffrence betwen one way salb & two way salb?
Whr should a joint be located in a beam if the provision of a joint is unavoidable??
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
0 Answers College School Exams Tests,
What is the meaning and full form of FTA and MTA in plumbing material
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)