PLC Based Process Automoation Panels?
Answers were Sorted based on User's Feedback
Answer / praveen kumar paulraj
PLC based process automation panels. which is nothing but
control system which uses PLC .the same process can be
controlled by other control systems, but, why by PLC because
in PLC we can write the logic by ladder diagrams,so that the
electrical engineer can understand the logic and, he can
easily re-program the logic in side the plc because the
ladder logic is just like wiring diagram.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / prvn
the control system which uses PLC is called PLC Based
control system .why PLC because we write ladder logic in plc
. it is invented for electrical engineers ladder logic
diagram is as same as relay logic diagram so they can
understand the logic inside the PLC. we can control system
also other means
| Is This Answer Correct ? | 2 Yes | 0 No |
what is phantom load, Give any example
What is precision of a measurement?
what is the condition for vector group of Dyn5
On a 10 KVA UPS we have to provide a DC MCB for Battery bank of 16 nos (12 V 65 AH). What Shall be the current rating of DC MCB ?
6 Answers RR, TNEB Tamil Nadu Electricity Board,
from which formula we select a capacitor rating?
what is the difference in inductance and resistance.both oppose the flow of current but how.resistance having + ve power in both cycle while inductance having both power.
what are the advantages by using IGBT in VSC HVDC than thyristor in conventional HVDC
what is mean by kneepoint voltage? when it will happen? ( my doubt is, if CT secondary is open means ct get saturation or blas? what are factors are required for calculations? plz give currect anws:
The rotor current is directly proportional to slip. How?
ACB & VCB how do work and saftes and how can maintenance in this and parts name show with picture
what happen if field of dc shunt motor opens? what is function of putting res. in parallel to one phase of 3 phase IM? the power supplied by 5A source in circuit is given by------Watt.
What type of changeover switch needed to run a load of five 1.5 tonn ACs.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)