Shall we get the reading on level transmitter only by
termination,without commissioning?
Answer / senthil.s
yes,we get the reading,but how we known that is correct
reading for that process.COMMISSIONING is the process check
the entire things including its operation,performance and
output for the process.So, only we need
commissioning.commissioning is right one for all.
| Is This Answer Correct ? | 7 Yes | 1 No |
What is the difference between EPROM & EEPROM.
how many types of elements are there?
can anyone tel the syllabus or previous year question paper for BHAVINI(EIE)2014.
Hi Friends , i need one urgent help , i am preparing for M.tech entrance examination , i need some obejective questions related to instrumentation field. where can i get those ? can anyone help me pls ?
why using 4-20ma not using 0-20or why not using 1- 20ma???????
How does one detrmine the direction of movement of core in an LVDT?
HOW WE MEASURE A DRUM LEVEL BY DP TRANSMITTER ? WHAT IS ITS FORMULA ?
describe flow nozzel principle?
What is derating factor in Motor?
why we should maintain neutral earth voltage below 1V while calibration? why cant it be 1.2V or 2V
Tell me about the synchronization panel.
what is the diffrene between DCS System and PLC System
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)