Direct chairs over shutter / beside earth is prohibited
because of ––
Answer / b. adinarayana
providing chair for function of making raft or slab or other construction unit with uniform thick ness and stiffness. so, if we are provide direct chairs over shutter / beside earth will not give uniform thickness also steel mat may bends and deforms will occur so direct chairs over shutter / beside earth is prohibited
| Is This Answer Correct ? | 0 Yes | 0 No |
Which code is used for tor & tmt steel bar?
how would you describe yourself and your ideal job
1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
0 Answers Quaid-e-Azam International Hospital,
i want texture painting pwd data
silt maximum in sand.
During reclamation how can the occurrence of mud waves can be rectified?
Should column area deducted from form work measurement of slab in building?
What is the difference between pvc,cpvc and upvc and where it is used as per their properties?????
what is the minimum and maximum water cement ratio
How many types of grades in concrete mixing
6 Answers White Horse Ventures,
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)