a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40
Answer Posted / jatin
10%
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
How does a traffic light signal work ?
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
How are freeway bridges built?
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
is concealed wiring a problem in fly ash brick wall?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
Who name us Engineer & Why?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building