a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40
Answer Posted / jatin
10%
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Which purpose we use deck anchor in bridges?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
How to test cement,sand,20mmbluemetal,40mmbluemetal,bricks,concrete by visual and instrument
in 100 cft = 1350 bricks in 100 cft = ? bloks
400 ku d/c clearess ketan hota hai?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
Wats the formula of eccentric footing and how was calculated from concrete qty
Explain what is structural frames or systems?
How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?
how to tie 10 legged stirrups
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?