a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40
Answer Posted / jatin
10%
| Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
What is fineness modulus ? and its sieve # ?
what is the maximum number of course that can be laid according to IS code and the max height.
What are the strongest shapes in building?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is difference between limit state and working stress method? How it is applies in building structure.
what is civil enginnering & what you need of this course?
What is the general specifications of a bituminous pavement road?
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
What is absolute pressure? How absolute pressure is calculated?
how to stop beam concrete between column
what is BPM in concrete demolition hammers. what is better a higher value or lower
Basic civil interview questions
What is the difference between 53 grade and 43 grade cement