a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40
Answer Posted / jatin
10%
Is This Answer Correct ? | 11 Yes | 1 No |
Post New Answer View All Answers
on what basis the partial factor of safety are decided? form the load combinations
What things architect have to take care of before starting any project?
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
What is meaning of FREE STANDING STAIRCASE ?
find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.
How does siphoning work?
What are the applications of cad?
How to calculate canal slope curvature qty!
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
What is Time period of a building and its relation with frequency ?
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
What is the diff between cad & cadd?