a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40
Answer Posted / pardeep kumar
More than 2%
Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
60-70 grade of Bitumen is VG-30 ?
What are some structures that may be subjected to fatigue?
Define absolute co-ordinates?
What is passive earth pressure ?
What is the difference between routing maintenance and major maintenance in school facilities?
Time required for curing of wall tiles before fixing
which steel is better for residential building tmt steel or hysd steel
what is high type road and low type roads
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
In cement concrete how to check a quality of material also proportion of material at site ?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?