a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40
Answer Posted / pardeep kumar
More than 2%
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
What should be the standard roof height like to be?
how to create our resume?
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
For the construction project what capital cost has to be taken in consideration?
What is the development length given in pile?
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
why is M30 grade Concrete use for Foothing & Column M50
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What is the difference between EPC,DBOOT and BOOT.
What are the different types of civil engineering?
Formula for calculating the volume of bulb in underreamed pile
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
can you give me the details of rate analysis of steel and concrete?