a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40

Answer Posted / pardeep kumar

More than 2%

Is This Answer Correct ?    0 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

60-70 grade of Bitumen is VG-30 ?

1660


What are some structures that may be subjected to fatigue?

653


Define absolute co-ordinates?

747


What is passive earth pressure ?

710


What is the difference between routing maintenance and major maintenance in school facilities?

661






Time required for curing of wall tiles before fixing

1766


which steel is better for residential building tmt steel or hysd steel

1767


what is high type road and low type roads

1190


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2049


What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?

2154


What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)

2031


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

1467


How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097

1753


In cement concrete how to check a quality of material also proportion of material at site ?

1425


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

1666