for preparing 10cum of 1:4:8 cement concrete the
requirement of sand is
0.7cum
2.8cum
4.74cum
18.40cum
& how
Answer / engr.asad ali
we know that
Total wet volume of concrete = 10Cu.m
First we find dry volume
Dry volume = wet volume X 1.54
Dry volume = 10 X 1.54 = 15.4Cu.m
Determine sum of ratio = 1+4+8 = 13
And also we know that
Quantity of Sand = ration of sand X wet volume
-------------------------------
Sum of ratio
Quantity of sand = 4 X 15.4
-----------
13
Quantity of Sand = 4.738 Cu.m say 4.74Cu.m
| Is This Answer Correct ? | 71 Yes | 4 No |
What is the sugested procedure of water purification for public supply?
How To do Steel Design of Beam,Columm,Slab,Staircase,Wall?
can you provide a link for manual design of building?
6. What would your co-workers say about you?
Differentiate orthographic and isometric projections?
I've beams dimensions of 9"x 18"x 45' please calculate the weight. Thanks
2 Answers SRR Properties, Student, Treetop Solutions,
How do we get this formula Ast=(0.5Fck/Fy) into(1-(in sqrt(1-((4.6Mu)/Fck.bd^2))into bd Fck=grade of cement i.e M25, M20 Fy=grade of steel i.e.Fe415,Fe250 Mu=moment b=width d=depth
what is curtailment in rebars
How much quantity water should be placed in one cubic meter area?
how to calculate rate analysis for shuttering of waffle slab
Allowable wastage for ready mix concrete?
what is the function of fineness modulus to determine the concrete mix?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)