How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answers were Sorted based on User's Feedback
Answer / thiraviam
after casting the salb it will take 28 days to cure
in 7 days time it will cure 65% and the rest will take
remaing days to cure
| Is This Answer Correct ? | 5 Yes | 1 No |
Answer / satishkumar
after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / manjunatha.h.s
How many days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
As per codal provision 7days curing by ponding +7 days
continues sprinking should be done, Minimum of 14 days
curing should be done to start casting a new slab upon it
therewhich Back propping should be given to the lower slab
in the column capital portions,
In case if ponding is not done, continues water sprinking
should be done for 21 days
| Is This Answer Correct ? | 1 Yes | 1 No |
how to calculate the value of 162?
2 Answers GKC Projects Limited GKCPL, L&T, OPG,
what is the mode of method of face bar measurement
Why we do design mix of concrete when there is nominal method using the IS-Code available ?
14 Answers Engineers India Limited,
Why bent up bars provided in R.C.C slab
16 Answers GATE, L&T, Omax,
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M hight 3.75 meter 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what will be the weigth of 50 kg/sq cm and 30 kg/sq cm compressive strength solid concrete block of 200 mm ?
How to findout safe bearing capacity after stabilization of soil by method of the confinde method.
Sunk slab means what ?
What is the difference between gray swr pipe & red swr pipe
how we can calculate the capacity of a proposed canal in a command area.
5 Answers KPL, MPPSC Madhya Pradesh Public Service Commission,
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)