for preparing 10cum of 1:4:8 cement concrete the
requirement of sand is
0.7cum
2.8cum
4.74cum
18.40cum
& how
Answer Posted / engr.asad ali
we know that
Total wet volume of concrete = 10Cu.m
First we find dry volume
Dry volume = wet volume X 1.54
Dry volume = 10 X 1.54 = 15.4Cu.m
Determine sum of ratio = 1+4+8 = 13
And also we know that
Quantity of Sand = ration of sand X wet volume
-------------------------------
Sum of ratio
Quantity of sand = 4 X 15.4
-----------
13
Quantity of Sand = 4.738 Cu.m say 4.74Cu.m
| Is This Answer Correct ? | 71 Yes | 4 No |
Post New Answer View All Answers
how i can tak Quantity of mortar in block work
why & what is perchatage we are using fly ash in concrete?
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
how to calculate rate analysys of 1:6 plastering 10 sq m
How can you produce desired alloys and discuss their applications in daily life.
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
what is the difference between replacement of cement by groundnut shell ash
What are the uses of alloys in daily life and how are alloys made?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Define What does civil status mean?