what is difference between plc and rtu?
Answers were Sorted based on User's Feedback
PLC is Programmable Logic Controller
RTU is Remote Terminal Unit
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / prashoo
Plc stands for programmable logical unit, is an embaded system where most of the controlling devices are lies. it has extremely fast switching, controlling and processing capabilities. So where this type of applications are require we use plc. it can run easily through a program to synchronize the input and output processes.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / vibhum bakshi
Plc- plc is a microprocessor/microcontroller based centralized controller which is devloped to perform sequential as well as discrete sequntial logic in industry environment for incresing productivity, redusing cost and incresing safty.
Rtu- rtu is stand for Remote telementry/terminal unit. It is microprocessor controlled electronic device that interface object in the physical world to a DCS or SCADA system by transmitting telementry data to a master system.
| Is This Answer Correct ? | 0 Yes | 0 No |
where is fixed bearing located?
I m doing my B.tech in production engg.... can i apply for the company? In which subjects i will have to focus for the preparation?
how to calibret load cell?
2 Answers Rain Cements, UltraTech,
start-up procedure of a centrifugal compressor
What is the specification of transformer?
Dear friends, I got admit in one of the u.s university.I didnt take TOEFL and the university which i had applied have accepted IELTS instead of TOEFL.But i am worried whether the u.s visa interviewers will accept IELTS.please tell me your views about this problem and also suggest how to answer this question.If anyone had faced the same problem please E-mail and share your experience to me.I would be gratefull if you do me this help. Thankyou
Difine the process you would establish to monitor the effectiveness of an emergency evacuation system
what is the need of rectifier?
Why control valves are hunting on manual mode?
0 Answers KBT, Sabic, Sun Operation,
what is the current rating of both primary and secondary of 500KVA,33KV./4ooV.distribution transformer.
What is quality management system?
What is the difference between preventive-maintenance and periodic-maintenance?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)