What is command line?
No Answer is Posted For this Question
Be the First to Post Answer
what we execute firstly wall tile or floor tile?
7 Answers Colliers International,
Why we add salt in silt content test of sand? Full reason ?
different type of formwork?
what is the weight of 6000 psi concrete in lb/cft?
what is the material consumption of 1:2:4 by kilogram?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
advantages & disadvantages of using crusher dust instead of sand in r.c.c work
3 Answers L&T, Shm Consultants,
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
what is the standard brick frog size ?
What is a deep beam ? Explain ?
undistributed samples are obtained by
What is change order request?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)