What is the cement and sand consuption of 1:4 block work
Answer Posted / abdul rasheeth
cement &sand ratio is 1:4
i.e.,1 ratio cement for 4 ratio of sand
cement quantity for this ratio =ratio of cement/ratio of sand
=1/4=0.25 ratio cement
we know that 1 m^3 cement =1440 kg
therefore amount of cement =0.25*1440 = 360 kg/m^3
lly the amount of sand is =360*4 =1440 kg/m^3
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
Who built the sears tower?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How much does the leaning tower of pisa lean?
Why reinforcement done in shorter span in two way slabs
what is idealized curve for concrere and steel
How many cement sand ballast in cc 1:4:8 40mm
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
3. What are the disadvantages of your present job, things you do not like about it?
five benefits of using standard terminology in the measurement process
How many axes do cartesian coordinate system has?
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
How is the leaning tower of pisa supported?
what does the track parameter mean in staad.pro?
Draw the cross section of a boundary wall and label its part with detailing?