how can we calculate steel value, depending on load
No Answer is Posted For this Question
Be the First to Post Answer
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
what is meant by hidden beam & purpose of hidden beam
2 Answers Carwell Construction, NTDC,
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
What is the meaning of a blue land surveyors flag?
how many nos of hacking over concrete surface required for 1 sq m area
12 Answers Creative Turnkey Projects, L&T,
what is lap length?
what is 43 & 53 in cement
pls give me some basic informations in construction of a structure?
1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"
What is the use of extruded feature in solidsworks?
calculate for 1 m3 cement, sand, coarse agree gate ,kg?
how do we design mix ratio?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)