How much cement,sand,bricks and water needed for 1square metre brick work?
No Answer is Posted For this Question
Be the First to Post Answer
What is the proportion of M 45 grade of concrete
what will be the grade of concrete for PCC having ratio 1:4:8?
For Wet Mix Mecadam design what is Optimum moisture content
What is semirigid connections?
How many axes do cartesian coordinate system has?
Trapezoidal section footing calculation of Volume & its Area
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
what is a pretension and post tension with an example
how much 20 mm metal is used in M25 grade desin mix in weight and sand for 1 cubic metre
sir please send me campus placement questions in civil engineering
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
For what purpose bedding is used under storm water drains, explain?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)