How much cement,sand,bricks and water needed for 1square metre brick work?
No Answer is Posted For this Question
Be the First to Post Answer
i want texture painting pwd data
Used Cement Mortar, Cement & Sand in 1 Square Meter or 1 Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
What is the difference between single reinforcement
how the calculation occurs if i want to mix 1cum of M50 concrete. please calculate every ingredients with detail calculation.
where you provide on column
what is the size of shuttering?????
4 Answers SKV Builders and Development Pvt Ltd,
What is Base Shear ?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
what is the actual productivity of carpentor,fitter,masson for brickwork and masson for plaster etc
HOW TO CALCULATE THE CEMENT & SAND REQUIRED FOR 1SQM BLOCKWORK OF 200MM THICK?
what is cement wastage percentage in NHAI ROAD WORKS
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)