for columns reinforcement the lap length is not provided then
how to rebar the rods then how rebar should be lapped
Answer Posted / suresh s
1st thing it should find that problem While Concrete Pouring Time immediately make The reinforcement at what length needed as per drawing.
2nd thing retrofitting method
3rd thing chip the column at lap height and tie the rod and weld it and pour the new concrete.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is smart building materials?
questions with answers to face an interview of an civil engineer regarding RCC buidings
what energized you to complete your course?
What is the yield of 100 litres of water and 10 kg of cement in grout mix?
What is specific gravity???
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
how i convert mm into standard wire guage (SWG)no.
What are the composition of a landfill?
What is the origin of name railway sleepers?
what is escalation?how it is done?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.