Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Abb 11kv how it is closing automatically when the cb is racking in and rack out when it reaching test position



Abb 11kv how it is closing automatically when the cb is racking in and rack out when it reaching tes..

Answer / hiltipower

when breaker in rack in position its limit switch closed
for only automatic operation when breaker rack out another
limit switch closed at rackout position so only manual
operation or test position operation possible

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

How can i calculate the Breaking capacity of molded case circuit breaker, is the breaking capacity of CB for Diesel generator shall be less than grid supply's breaker ?

0 Answers  


what is the main difference b/w contactor and relay

2 Answers   Pace Pharmaceuticals,


HOW TO CALCULATE EACH PHASE CURRENT WHILE A MOTOR CONNECTED TO STAR- DELTA STARTER?

3 Answers  


What is polar plot?

0 Answers  


Dear Sir how much cable size required from 0.75 kw to 50 kw for electric motor or pump

1 Answers  


oltc of a transformer, how it works? and what are the equipment consist of describe briefly?

0 Answers  


can anyone explain the star-delta motor control wiring ,which wire go where and how they operate?

0 Answers  


How works the AVR in DG Sets Plz explain??????????

1 Answers  


I Have 100Ah battery with 650VA Inverter, i WANT TO TAKE a Solar panel to charge my battery, so please suggest me,what rating of solar panel(with solar charge controller) can buy for a load of 450w for 4 hours

1 Answers   Chevron,


why the flooring of substation is done with small pebbles or stones..?

16 Answers  


How to prepare electrical preventive maintenance plan & shedule of machine tools.

2 Answers  


at which voltage level arcing ground is occurs ??????????

0 Answers   TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)