Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the minimum spacing required for slab & beam
reinforcement

Answer Posted / subhasbabu

FOR SLAB FOR MAIN BAR 3 TIMES THE DIAMETER AND 5 TIMES FOR
DISTRUBUTION BAR, BUT IN THE CASE OF BEAM MAXIMUM SIZE OF
AGGREGATE, AND MINIMUM BARS 2NOS FOR MAIN REINFORCEMENT

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate total cost for slab 35'×8'

1924


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

3041


resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil

2693


HOw much % of premium on DSR-2013 currently

1963


What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?

1147


What is c.g.i sheet which used for roof??

1927


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2574


What is hybrid foundation?

1125


Define different types of roof systems?

1189


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

2114


What are the different types of civil engineering?

1158


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2088


how much cement and sand consuptin in 4 inch siporex walls 100 sq ft

3001


how can calculate cutting length of diamond ring

1842


how to calculate MR 9(derivation)

2954