Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When we will do simulation for I/P?IF WE DO SIMULATION through which way either series or parallel?



When we will do simulation for I/P?IF WE DO SIMULATION through which way either series or parallel?..

Answer / ilayaraja

simulation for i/p always done in pararel.if you r simulating with out removing the control room signal wires, u need to put your simulator in sink mode.sink mode means it uses the voltage in the loop

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Instrumentation Interview Questions

I want to use 1/2 inch SS316 tube in my high pressure & temperature (64 kg/cm2 & 500 deg C)after condensate pot in pressure tranmistter. 1) Is it possible to use 1/2" ss316 tube in high pressure and temperature line. Tube manufacturer is local vendor. 2)On sarting the plant, We need to do system fluse that time condesate is not in the condesate pot so steam is directly contact with the tube. We have no exact calculation to know our tube is ok or nor at this time. pleae,reply.

1 Answers  


What is the difference between PLC and DCS?

4 Answers   Honeywell,


A length of steel pipe is used to carry sea water to a desalination plant. An adequate corrosion allowance must be specified and indicated in the piping specification, which affects the _________________________ of the pipe

0 Answers  


which is the best type to measure level of a Tank(water). Displacer or Differential Pressure method?

2 Answers  


ON RADAR INTERFACE LEVEL TRANSMITTER IF DI-ELECRIC IS WRONG WITH CONTINIUS PROCESS THAN HOW CAN INDENTIFY OR HOW CAN I PUT NEW DI-ELECTRIC VALUE?(ROSEMOUNT-TDR-3300-COXIAL PROBE TYPE)

1 Answers   Chevron Phillips,


List three types Level Switches with their working principles

0 Answers  


wht is mean by dpt(differential pressure transmitter)

1 Answers  


In instrumentation standard we use 4 to 20ma for transmission , why cant we use 3 to 19ma ?

1 Answers   NSH,


explain level transmitter working

1 Answers  


i m passed my engineering in 2010 in instrumentation and control engineering. my question is can i apply for software jobs or vacancies.??????????? plz give me answer soonnn......

2 Answers  


IF ASK IN THE INTENVIEW WHAT TYPE OF BMS YOU USE?

1 Answers  


why are set -10vdc in bently neveda vibration system.

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)