Fot testing new star-delta 132 kw motor in electrical
worshop.we should check in star or delta connection as we
do not have higher capacity cable in worshop?

Answers were Sorted based on User's Feedback



Fot testing new star-delta 132 kw motor in electrical worshop.we should check in star or delta con..

Answer / prafull dhuri

I Think we will check motor in star , because in star
connection motor will takes less current

Is This Answer Correct ?    5 Yes 0 No

Fot testing new star-delta 132 kw motor in electrical worshop.we should check in star or delta con..

Answer / k.prakashchandra

As you are checking for connection only ,smaller capacity
cable will serve the purpose.

Is This Answer Correct ?    1 Yes 0 No

Fot testing new star-delta 132 kw motor in electrical worshop.we should check in star or delta con..

Answer / suresh

Motor in star connection less current will take ,No need higher capacity cable for trail.

Is This Answer Correct ?    0 Yes 0 No

Fot testing new star-delta 132 kw motor in electrical worshop.we should check in star or delta con..

Answer / k.prakashchandra

To check whether connected in star or delta ,just open the
terminal box of the motor .

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

how we calculate full load current of A.C & D.C Motors?

1 Answers  


How can I model an open-delta ground transformer for a network supplied by 4 unit GTG and power transformer in ETAP?

1 Answers  


why vector group used in transformer and what effective in output

1 Answers  


HOW MANY POLES ARE THERE IN 3 SLOTS PER POLE PER PHASE MOTOR

2 Answers  


which course is maximum demand in industry and give me the list of best courses for electrical engineers

1 Answers  


HAT IS THE EFFECT OF LOW POWER FACTOR ON THE GENERATING STATION?HOW WILL YOU IMPROVE THE LOW POWER FACTOR?

1 Answers  


Difference between divercity and power factor

1 Answers  


Why does an induction generator is preffered as compared to synchronous generator in especially a wind energy power production project?

1 Answers  


in magnetic field we send current to generate flux,why not voltage?

2 Answers  


WHY CURRENT DECREASES WHEN VOLTAGE IS INCREASED IN A CURRENT TRANSFORMER ?

5 Answers   Sterling Wilson,


what is the importance of fault level in power system and how is it decided

2 Answers  


why in three phase 440 circuit in all phase current is almost equal L1-35 A,L2-34 A ,L3-31 A but in nutral when i check with clamp meter it shows 25 A?

4 Answers   OPS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)