08. 4 main points about check list for Shuttering works
are––– 4

i)


ii)


iii)


iv)

09. 4 main points about check list for Concreting works
are––– 4

i)


ii)


iii)


iv)

10. 4 main points about check list for Plaster works
are––– 4

i)


ii)


iii)
iv)
11. 4 main points about check list for Brick works are––
– 4

i)


ii)


iii)


iv)

12. 3 main points about Project delaying factors are–––
3

i)

ii)
iii)


13. Write down 60-grade M.S. deformed bar
specification. 3


14. 3000 psi concrete means:
1

15. 4 main points about methods of wastage control are––
– 4

i)
ii)

iii)
iv)
16. 1 main point about reasons for your honesty is :
1

17. Water cement mixing in hopper less mixture machine
is better than hopper mixture machine because: 1


18. 2 main points about your role during roof casting
are–––– 2
i)
ii)
19. a. The weight of 3333m deform bar of 24.5 mm dia
is…… 1
b. The weight of 300 rft plain bar of dia 1
is……. 1
20. The types of slumps are–––
3
i)
ii)
iii)
21. 4 main points about the causes of cylinder failure
are––– 2
i)
ii)


iii)
iv)

22. Detection of a beam & a girder are––––
2

i)
ii)
23. Curing is needed for––––
1
24. The types of slabs in respect of size & shape are–––
5

In respect of size: i)

ii)

In respect of Shape i)

ii)

iii)
25. The types of Column in respect of size & shape are––
– 9

In respect of size: i)
ii)



In respect of Shape: i)
ii)
iii)
iv)
v)
vi)
vii)
26. 3 field tests & 3 Laboratory tests of bricks are–––
6

Field tests: i)
ii)
iii)

Lab test: i)
ii)
iii)
27. 2 field tests & 1 Laboratory tests of sand are–––
3

Field tests: i)
ii)

Lab test: i)
28. 1 field tests & 1 Laboratory tests of M.S rod are–––
2

Field tests: i)

Lab test: i)
29. a. The % of water absorbs by brick chips: ……………
1

b. The % of water absorbs by Stone chips: ……………
1

30. In respect of design:
5
a. The % of strength gains by concrete in 28 days=

b. The % of strength gains by concrete in 14 days=

c. The % of strength gains by concrete in 07 days=

d. The % of strength gains by concrete in 03 days=

e. The % of strength gains by concrete in 28 days
without curing =

Answer Posted / moin khan

1.Layout cutout size &level
(as per drw.)
2.Soupport fixing
3. Oiling shuttering board
4.ghoogu in beam higher dept

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain what is progress payment?

696


I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent

1770


why do we provide haunches in rcc box or underpasses?

2461


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2035


how much shouid be the rate for ready mix concrete per cubic meter

1453






Why joints are provided?

663


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

1642


How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)

1722


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1676


Define What is unit weight of normal concrete?

661


What is horizon or horizontal mining?

628


what is called the inverd level of mabhole chamber?

1616


reinforcement slab, beam and column formulas?

2181


How to calculate construction cost of residential building in mumbai

1460


cement and sand required for one block of size 0.23*0.15*0.46

1365