08. 4 main points about check list for Shuttering works
are––– 4
i)
ii)
iii)
iv)
09. 4 main points about check list for Concreting works
are––– 4
i)
ii)
iii)
iv)
10. 4 main points about check list for Plaster works
are––– 4
i)
ii)
iii)
iv)
11. 4 main points about check list for Brick works are––
– 4
i)
ii)
iii)
iv)
12. 3 main points about Project delaying factors are–––
3
i)
ii)
iii)
13. Write down 60-grade M.S. deformed bar
specification. 3
14. 3000 psi concrete means:
1
15. 4 main points about methods of wastage control are––
– 4
i)
ii)
iii)
iv)
16. 1 main point about reasons for your honesty is :
1
17. Water cement mixing in hopper less mixture machine
is better than hopper mixture machine because: 1
18. 2 main points about your role during roof casting
are–––– 2
i)
ii)
19. a. The weight of 3333m deform bar of 24.5 mm dia
is…… 1
b. The weight of 300 rft plain bar of dia 1
is……. 1
20. The types of slumps are–––
3
i)
ii)
iii)
21. 4 main points about the causes of cylinder failure
are––– 2
i)
ii)
iii)
iv)
22. Detection of a beam & a girder are––––
2
i)
ii)
23. Curing is needed for––––
1
24. The types of slabs in respect of size & shape are–––
5
In respect of size: i)
ii)
In respect of Shape i)
ii)
iii)
25. The types of Column in respect of size & shape are––
– 9
In respect of size: i)
ii)
In respect of Shape: i)
ii)
iii)
iv)
v)
vi)
vii)
26. 3 field tests & 3 Laboratory tests of bricks are–––
6
Field tests: i)
ii)
iii)
Lab test: i)
ii)
iii)
27. 2 field tests & 1 Laboratory tests of sand are–––
3
Field tests: i)
ii)
Lab test: i)
28. 1 field tests & 1 Laboratory tests of M.S rod are–––
2
Field tests: i)
Lab test: i)
29. a. The % of water absorbs by brick chips: ……………
1
b. The % of water absorbs by Stone chips: ……………
1
30. In respect of design:
5
a. The % of strength gains by concrete in 28 days=
b. The % of strength gains by concrete in 14 days=
c. The % of strength gains by concrete in 07 days=
d. The % of strength gains by concrete in 03 days=
e. The % of strength gains by concrete in 28 days
without curing =
Answer Posted / moin khan
1.Layout cutout size &level
(as per drw.)
2.Soupport fixing
3. Oiling shuttering board
4.ghoogu in beam higher dept
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Define mirror?
All aptitude question of Bechtel
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Can we apply curing compound on ceiling (slab Bottom)
Define What are the uses of Groynes?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
Explain how you can turn off the display for dimension in CAD?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
2nd and 4rt angle elevation used in which country ?
What is the absolute pressure scale?
What is Gsb tollens ?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
how water proof chemicals act in concrete to avoid leek?
What is the difference in painting using Roller and Brush? What is the paint consumption difference? As per IS one coat of painting is painting from left to right and top to bottom whether this can be done using roller ( Roller Stick height and feasibility) ?