how much cement consumption in 1 sqmt of wall cleading work
(dedo)?

Answers were Sorted based on User's Feedback



how much cement consumption in 1 sqmt of wall cleading work (dedo)?..

Answer / ronak shah

Dear sanchit,

Your 2 nd answer I think logically wroung. Can u give me how to
calculate consumption of cement. What thickness are you consider? If possbile.

Is This Answer Correct ?    2 Yes 0 No

how much cement consumption in 1 sqmt of wall cleading work (dedo)?..

Answer / sanchit guleria

thickness of neat cement layer is 1.5mm.
so cement required for 1sq.m= 1*0.0015=.0015cu.m
dry vol. of cement increased by 25% so (.0015+.0015/4)=.001875cum=.054 bag=2.67kg of cement

Is This Answer Correct ?    2 Yes 1 No

how much cement consumption in 1 sqmt of wall cleading work (dedo)?..

Answer / sanchit guleria

for 9.3sq.mt= 6 bags
1 sq.mt=.65=42.5kg of cement

Is This Answer Correct ?    1 Yes 1 No

how much cement consumption in 1 sqmt of wall cleading work (dedo)?..

Answer / sanchit guleria

for 1 sq mt requires 6 bags of cement

Is This Answer Correct ?    2 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

How to estabilish reinforcement Steel rolling margin for a building projects ?

0 Answers  


For raft 3000mm thickness with T25150 mesh reinf in top and bottom what diameter can be used for chair to support mesh reinforcement

4 Answers  


best hand book for civil engineers with practical criteria

2 Answers  


What is the unit weight of steel?

1 Answers  


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

0 Answers  






how much lap we should provide in columns for Fe-500?

8 Answers  


TELL ME THE EQUATION FOR OGEE SPILLWAY

0 Answers   TCE,


Minimum and maximum size of the building components

0 Answers  


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

0 Answers  


how 2 find out slap steel quantity ? plz help me

1 Answers   NCC,


What is difference between combin footing & rapt footing

0 Answers  


Define relative co-ordinates?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)