how much cement consumption in 1 sqmt of wall cleading work
(dedo)?

Answer Posted / sanchit guleria

thickness of neat cement layer is 1.5mm.
so cement required for 1sq.m= 1*0.0015=.0015cu.m
dry vol. of cement increased by 25% so (.0015+.0015/4)=.001875cum=.054 bag=2.67kg of cement

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What out turn civil works

6341


115mm thickness brick work how to required mortar

1626


What is an ice dam sock?

699


What is the difference between Hinged and pinned in Column ends

4774


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

1771






sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2402


How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members. 

2846


what is the 0 value in quantity surveying

1923


what is column foundation

1830


Explain what are the problems one might face while having a Cantilever balcony?

822


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

1706


what does the track parameter mean in staad.pro?

5450


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2017


types of laps in column

1908


Consumption of Binding wire for fixing of cover block in vertical surface

1033