how much cement consumption in 1 sqmt of wall cleading work
(dedo)?
Answer Posted / sanchit guleria
thickness of neat cement layer is 1.5mm.
so cement required for 1sq.m= 1*0.0015=.0015cu.m
dry vol. of cement increased by 25% so (.0015+.0015/4)=.001875cum=.054 bag=2.67kg of cement
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Explain the Strength of brick?
How to come 1.54 from dry to wet concrete?
What are the causes of building collapse?
How many cum of 9.5mm stone in 1 ton ?
What is geopolymer based concrete?
What is the Maximum %age of Steel in columns and beams ?
what is the name of shuttering oil used in oman
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
How to do rate analysis for concrete work including shuttering work?
What do you mean by bond? What are the different types of bonds?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
is concealed wiring a problem in fly ash brick wall?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Which stone is best for wall construction Laterite Stone or Cement Blocks