If we have to feed a housing complex having load 8MVA, than
what would be the better option, either we first step down
33kv supply into 11kv & than 430v or we proposed no of
33/.44 kv transformer, also which option is economical?
No Answer is Posted For this Question
Be the First to Post Answer
In a star-star connected h.t transformer why we use NGR on the secondary (l.t)side.
How servo stabilizer works.
Why the wave trap is put in Y phse only in switchyard?why not in other phases?
What are the neccessary safety arrangements before commissioning of HV substation?
How does a television work?
capacitor applied voltage is 1100VDC & capacitance value is 82uF how to calculate current of capacitor.
What is the Impedance, inductive reactance calculations
Load transfer in 11kv double busbar switchgear - operation.
why does a dc machine has high efficiency while working as a generator than as a motor ..
how can we say that stator magnetic field rotates with synchronous speed?can we derive?
PAC and simple Ac different
At which time Synchronous generator act as a Synchronous Condenser?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)