If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / pranav pachori
NO FULL COMPACTION I.E 90%REQUIRED THOUGH WE CAN SUGGEST TO DESIGNER TO REDUCE THE THICKNESS OF SUB GRADE THOUGH GENERALLY SOIL NOT EXHIBIT SUCH A HIGH CBR LIKE 30% BECAUSE SUCH KIND OF HIGHER CBR BELONG TO GSB MATERIAL
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
Test procedure of fly ash bricks as per code ?
How many types of slabs are there & how to design it?
How many axes do cartesian coordinate system has?
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
I need old MMUP exam question and answer for Civil engineering
Explain soil analysis?
How many % we consider for lap for reinforcement for estimates
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
How much of the strength of concrete comes from post- production curing?
How to determine thee cut length for steel reinforcement bars in R.C.C design
How much cement,sand,bricks and water needed for 1square metre brick work?
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
What tor stands for in tor steel?