If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / pranav pachori
NO FULL COMPACTION I.E 90%REQUIRED THOUGH WE CAN SUGGEST TO DESIGNER TO REDUCE THE THICKNESS OF SUB GRADE THOUGH GENERALLY SOIL NOT EXHIBIT SUCH A HIGH CBR LIKE 30% BECAUSE SUCH KIND OF HIGHER CBR BELONG TO GSB MATERIAL
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
strength vs shape factor
how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
What is portland cement
how to calculate testing date
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What do you mean by bond? What are the different types of bonds?
what is pqc
What is the difference between one-way slab and two-way slab?
What is fineness modulus ? and its sieve # ?
What are the responsibilities of a construction manager?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is progress payment?
what is the method used for marking of cantilevers in hirise buildings by using theodolite