If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).

Answer Posted / hitesh kanpariya

No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Questions related to civil.engg in company

1572


2nd and 4rt angle elevation used in which country ?

1835


what are the types of dimensioning?

1729


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1487


what is the method used for marking of cantilevers in hirise buildings by using theodolite

2427






how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress

1376


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

1686


rimmer in pile foundation

2133


What was asked in isro civil interview

496


What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?

1608


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

1915


how to calculate mivan shuttering matrial

960


Is there any course for billing available in Mumbai? If yes then please mail me the details..

1807


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

10197


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1686