If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answer Posted / hitesh kanpariya
No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Questions related to civil.engg in company
2nd and 4rt angle elevation used in which country ?
what are the types of dimensioning?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is the method used for marking of cantilevers in hirise buildings by using theodolite
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
rimmer in pile foundation
What was asked in isro civil interview
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
how to calculate mivan shuttering matrial
Is there any course for billing available in Mumbai? If yes then please mail me the details..
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.