Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is post close & pre close of trip circuit supervision
relay in circuit breaker control scheme?

Answers were Sorted based on User's Feedback



what is post close & pre close of trip circuit supervision relay in circuit breaker control sc..

Answer / ashish patil

Preclose means breaker in off condition it supervise the trip coil & trip ckt is healthy.
& Postclose means It supervise When breaker is ON.

Is This Answer Correct ?    43 Yes 5 No

what is post close & pre close of trip circuit supervision relay in circuit breaker control sc..

Answer / k.prakashchandra

It will supervise the trip circuit before and after closing
the breaker

Is This Answer Correct ?    18 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

Define ohm’s law for a.c (alternating current)?

0 Answers  


in control scheme dc logic wiring commonly using negative loop,what is the reason?if we use positive looping what will happen?

0 Answers   DNJ Energy LLC, WI,


Why only 1 CVT in Y-phase is used for synchronization in 3 phase power system?

1 Answers   Reliance,


why buchholz relay is kept on inclined position and why it is cover??

1 Answers   GSECL,


What is electrical energy ,power?

2 Answers   ABB,


An ELHNC 80amp 240v 30mA RCD is tripping periodically, every 30 - 180 seconds is it safe to disconnect the protection circuit?

0 Answers   HAL,


How to Calculate the current drain in the battery (1.4V) for the 2mins time period?

7 Answers  


WE are using a 63A MCCB(SIEMENS MAKE) for one of the feeder in LV substation panel.It is supplying to a lighting & power socket DB.Settings in the MCCB is Ir = 63 * 1 , Isd = 8 times of Ir , tsd = 0.5 sec( I2 t off). Sometimes this MCCB is tripping .But no trip in DB MCB. Can anybody tell me reason ? From where i can know about the MCCB settings?

5 Answers  


whu the transformer noise during running condition?

1 Answers   NTPC,


if i have 5kw,9A,three phase induction motor,if i want to install it 100 meter away from its feeder,how i will culculate cable size for this load.

2 Answers  


We use ACB in LT and VCB in HT.But if we use VCB in LT and ACB in HT that what will be the effect on the system or any power range?

6 Answers   Honda,


why tan delta test conducted in electrical equipmenr

4 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)