what is post close & pre close of trip circuit supervision
relay in circuit breaker control scheme?
Answer Posted / k.prakashchandra
It will supervise the trip circuit before and after closing
the breaker
| Is This Answer Correct ? | 18 Yes | 5 No |
Post New Answer View All Answers
what is class of SPD and dittels of all class ?
what is kondo syatem in eletrical traction
Make a list observation on Transformer?
PLEASE SEND ME NTPC RELATED INFORMATION LIKE WHICH TOPICS HAV MORE SCOPE,BOOKS TO READ,CUT OFF...PLEASE.mail at thiru.1203@gmail.com
how ct burden,magnetising current,ratio and knee point voltage are related & derived
write circuit diagram for a motor rotate in forward direction once it started and when pressed the same button it should rotate in anticlockwise.
why single CT used in DOL starter power circuit?
i m in need of current rating chart of heavy duty pvc/xlpe, cu/al cables. can somebody provide me? if yes, plz send me at ashish_patel111@yahoo.com
Define average demand?
What is the basic principal, by which DC voltage level is increased more than the supplied AC voltage during conversion. As upto AC level it is contorrled by firing anlge but after maximum level how is it possible.Please clear picture. OR we have to supply the higher level AC?
What is a parabolic signal?
what are the breakdown voltage rating of mini- curcuit'transfarmer!
thyristor controlled APFC panel design parameter?
How can i get my certificate of competency as an electrical supervisor? I have complicated my B.Tech from Uttarakhand technical university this year (2012).
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.