how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars..

Answer / elango

10*10/8*8*100=156.25mmc/c

Is This Answer Correct ?    9 Yes 3 No

how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars..

Answer / bhaskarrao

Present D*d*oldspacing/100

Is This Answer Correct ?    2 Yes 0 No

how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars..

Answer / elango

10*10/8*8*100=156.25mmc/c

Is This Answer Correct ?    2 Yes 0 No

how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars..

Answer / san

125mm

Is This Answer Correct ?    2 Yes 1 No

how to find out spacing inbetween bars instead of 8dia 100c/c to 10dia bars..

Answer / parveen joshi

125mm c to c

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

What are the different approaches in designing the floors of the service reservoirs?

0 Answers  


m-25

3 Answers  


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

0 Answers   Ravi Group,


How to calculate the quantity of cement mortar 2" for mosaic tile fixing 12"x12"?

0 Answers  


say the propotions of different concrete mix desidn(M20 M15 M25 M25 M30)

4 Answers   Hayat,






How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete

4 Answers   JSW,


what is BOQ? BOQ IS US IN ESTIMATE

8 Answers  


3. What are the disadvantages of your present job, things you do not like about it?

0 Answers  


describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?

1 Answers   BTL Infra, Jaypee,


can stub column take the load as main column

0 Answers  


How can I calculate the Compressive strength of cubes after 28 days of curing?Is there any formula or ration ?

7 Answers  


comparision difference between GSB and WBM subbase in road construction

1 Answers   CPWD,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)