Since atleast 6 cubes are taken for a batch of concrete, it
is advisable to take 3 each at both location, so that we get
clarity on workability of concrete.Average result of these 6
cubes will hold good.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
Sir how to find cutting length for footing steel bars in the shape of "u"
What are the applications of cad?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
What is passive earth pressure ?
i need gate exam civil engineering question papers with answers
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
what is shuttering co efficient?
What is the minimum size of the particles of silt soil?
What is the name of this multiplication factors ?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
For what building Built-on balconies are preferable? What are the advantages?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)