What is ideal location for cube casting, RMC vehical at
Ground Floor and Slab casting at 40th Floor
Answer Posted / sudhir shetty
Its at the ground floor because during pumping there will be
some loss of slurry etc which is calculated during designing
of structure after which required strength is calculated. If
its taken in 40th floor u will not get the perfect sampling.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How to find beam R/F cutting length
How to find CN by using arcgis 9.3?
Can we apply curing compound on ceiling (slab Bottom)
what is Brick crushing strength(PSI)?
What is type failure of road surface? how to repair the failure of road surface?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
How do you prepare Material Recovery Statement for deduction from contractors bills?
Difference between lime, distemper and plastic emulsion?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What are the techniques to measure road difference?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
What is zoning permit?
what is polity