What is ideal location for cube casting, RMC vehical at
Ground Floor and Slab casting at 40th Floor
Answer Posted / sudhir shetty
Its at the ground floor because during pumping there will be
some loss of slurry etc which is calculated during designing
of structure after which required strength is calculated. If
its taken in 40th floor u will not get the perfect sampling.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
How much cement and sand required for 9"brick wall per square metre
is concealed wiring a problem in fly ash brick wall?
What is the use of offset command?
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
can any one explain bar bending schedule of bems and columns and slabs ??
what is tension & compression of steel bending.
1m square 20mm plastering how much of water need curing work
What is gravity flow?
how to calculate the density for high density concrete ? or is it same as the density of RC?
plz.show development and anchorage length in simple diagram.
Detection of a beam & a girder areββββ
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
i want texture painting pwd data