For calculating the productivity we have to know the
capacity of Excavator.
Let me assume the capacity of the Volvo 210 excavator =
1.22 Cum.
Consider the efficiency as 75% (This may be changing based
on the type of material to be excavated)
Therefore, net capacity = 1.22*75%= 0.92 Cum.
time per swing(unload,swing,fill,swing) = 20seconds =>
20/60 = 0.33minutes
Consider 5 minutes rest taken by the operatoer per hour.
Therefore, no of cycles per hour = 55/0.33 = 165
capacity per hour = 165*0.92 = 151.8 Cum/Hour
In similar fashion for dozer and other equipment can be
calculated.
| Is This Answer Correct ? | 139 Yes | 38 No |
Answer / m subbramanian
Along with above calculation, the distance travelled by the machine should also been taken into account.
| Is This Answer Correct ? | 44 Yes | 6 No |
Answer / manumitra singh
case-1 say komatsu 450 is used
1)bucket capacity-2.4 cum
2)ideal output=load per cycle*no. of cycle/hour
=2.4*100 (considering 35 second cycle say)
=240 cum
3) apply correction factors
a)excavator correction=0.8(if area is not a trench exactly bucket size in which case it is1
b)load factor=0.8(if load has to be dumped in tippers and not kept aside)
c)soil factor=0.67 in case of hard digging and0 .85 in medium digging
d)swing factor=1.07 for 75degree and 0.71 in case of 180 degree.
e)performance efficiency=0.83 if 50 minutes work is done in one hour.
4)corrected output=ideal ouput*a*b*c*d*e
ex: corrected output=240*0.8*0.8*.67*1.07*0.83=91.7 cum
| Is This Answer Correct ? | 29 Yes | 5 No |
Answer / ashebir
calculation for productivity of construction equipment
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / mickey
There is a program can calculate that based on type of soil, distance to dump site etc. MechaNorm by Giant Robot Systems
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / vinod k
I think 75% efficiency is correct as excavation of soil itself takes time & depends upon the area where excavation is to be done, if the excavation area is mix of soil & rocks then efficiency will be less & No. of cycles/hr will also come down.
This calculation is for ideal condition.
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / mandar
i believe that the 75% efficiency taken is of operator then the rest taken is not applicable as it is included in the efficiency. As well the material swell factor and the bucket fill factor should also be taken in account plus the machine availability factor should be also accounted (generally less 85 to 95% considered).
| Is This Answer Correct ? | 1 Yes | 6 No |
How much 1 cum of M15, M20 & M25 concrete weigh?
what is the formula of calculating number of bars?
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?
how many type of pipe using in plumbing?
15mm thick plastering 1:4 what is the cement consumption per sqm
What should be the size (Cubic meter) of a water tank for 1000 Ltrs. capacity?
What is the deffrence multistory bulding &highrise bulding
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
what is the name of shuttering oil used in oman
What is progress payment?
how you calculate the qty. of cement ,sand,aggregate from proportion 1:2:4 M15
What should be the standard roof height like to be?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)