How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper

Answer Posted / mandar

i believe that the 75% efficiency taken is of operator then the rest taken is not applicable as it is included in the efficiency. As well the material swell factor and the bucket fill factor should also be taken in account plus the machine availability factor should be also accounted (generally less 85 to 95% considered).

Is This Answer Correct ?    1 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is an ice dam sock?

695


(Project Management Topic) What are the important criteria in the successful realization of the project?

1651


what is project?

1909


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2622


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

1831






what is the procedure of wet seiving. n percentage of silt in different type of soil?

2162


on what basis the partial factor of safety are decided? form the load combinations

1801


how can i calculate cement in brickwork

3455


How do you compute the volume of airflow?

671


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

3591


For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.

1616


how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?

1566


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1326


Coverage of 25mm.thick ratio of 1:4 cement mortar?

1398


Define a polyline?