How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper
Answer Posted / mandar
i believe that the 75% efficiency taken is of operator then the rest taken is not applicable as it is included in the efficiency. As well the material swell factor and the bucket fill factor should also be taken in account plus the machine availability factor should be also accounted (generally less 85 to 95% considered).
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
What is packing Factor ?
What is binding spacing of the rebars at lapping zones.
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
Spider cracks occur in beam bottom due to––
why demand factor less then 1 ?
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
Mention what are the composition of a landfill?
What is the difference between absorption & adsorption and sorption?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
How to increase a bearing capacity of soil?
how many minimum admixtures are used in water froofing structures
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
What is Refuse Area In High Rise Building ?