How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper
Answer Posted / mandar
i believe that the 75% efficiency taken is of operator then the rest taken is not applicable as it is included in the efficiency. As well the material swell factor and the bucket fill factor should also be taken in account plus the machine availability factor should be also accounted (generally less 85 to 95% considered).
| Is This Answer Correct ? | 1 Yes | 6 No |
Post New Answer View All Answers
pls mail some more tecnical qustions at msaranya2610@gmail.com
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
How to calculate chejja reinforcement
Explain the importance of moment of inertia?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
List out the potential risk factors for workers on the construction site?
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
In Rcc ratio calculation I wanted to know quantity of Steel also.
What are the skills required to become an architect?
what is the function of GSB all class ?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
what is the calculation of raw material for 0.35cum of m-15
What year was the keystone power plant in Indiana County constructed?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?