case-1 say komatsu 450 is used
1)bucket capacity-2.4 cum
2)ideal output=load per cycle*no. of cycle/hour
=2.4*100 (considering 35 second cycle say)
=240 cum
3) apply correction factors
a)excavator correction=0.8(if area is not a trench exactly bucket size in which case it is1
b)load factor=0.8(if load has to be dumped in tippers and not kept aside)
c)soil factor=0.67 in case of hard digging and0 .85 in medium digging
d)swing factor=1.07 for 75degree and 0.71 in case of 180 degree.
e)performance efficiency=0.83 if 50 minutes work is done in one hour.
4)corrected output=ideal ouput*a*b*c*d*e
ex: corrected output=240*0.8*0.8*.67*1.07*0.83=91.7 cum

Is This Answer Correct ?    29 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the size of triangular ring in rcc column?

1333


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

1672


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1674


How much percentage of brick bats allowed in CD-75 bricks

1874


What is the material consumption- cement,sand,tiles etc for Toilet dado?

7038






rimmer in pile foundation

2097


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

2761


from where ican get sample papers for CET-delhi 2012

2022


what is the difference between np2 and np3 concrete mix

1540


What is the difference between one-way slab and two-way slab?

648


I need to constructive work in amaraj batteries

1385


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2167


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

2826


02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.

1660


how will remove spiderweb cracking in plaster ? what the reasone of make it ?

1491