How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper

Answer Posted / mickey

There is a program can calculate that based on type of soil, distance to dump site etc. MechaNorm by Giant Robot Systems

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why the finite element method is lower bound solution?

2285


What is the name of this multiplication factors ?

1699


one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

1460


Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.

1779


How do you calculate load bearing capacity of a waffle slab?

2203






How can we make a hole in a solid rectangle using solidsworks?

750


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

1963


What are the phases inspections are done by local authority while construction?

709


Technical Question of Civil Engineering

1883


sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience

1918


How do we calculate the power of centrifugal pump?

681


What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.

1324


How to calculate brick work quantity?? Block work quantity??

2101


I would like to get the formula How can i calculate the productivity of a mason in terms of brick laying and plaster. i have 6000 Sqmt of interlock laying work i want to calculate - how many masons required to do the job - in how many days can it be done - what will be the production rate in 8 hours shift/ per mason if i can get some excell sheet , it will really help me in my calculations

1021


What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?

2103