How to calculate productivity of construction equipment
like excavator, dozer, rock breaker, riper
Answer Posted / m subbramanian
Along with above calculation, the distance travelled by the machine should also been taken into account.
Is This Answer Correct ? | 44 Yes | 6 No |
Post New Answer View All Answers
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
Explain what are the skills required to become an architect?
What is the diff between cad & cadd?
what radial pressure, the NP2 class rcc pipe can sustain?
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
What is meaning of FREE STANDING STAIRCASE ?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u
What was asked in isro civil interview
What does civil status mean?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what is the criteria for the finalisation of pavement thickness in road project?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S