Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is dol starter



what is dol starter..

Answer / pillay

DOL starter means a Direct On Line starter, where the AC
supply is directly applied across the motor terminals
whenever it is used unlike some bigger motors where the
power supply goes through a starting system to enable a
smoother start or a reduced current start.Some examples are
star delta ,auto transformer starter ,rotor resistance
starter, soft starter etc.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is a bus post insulator? explain its application in a substation.

1 Answers   Enercon, HAL,


I have suguna 3 hp pump for my agreeculture work.It deliver the water from 45 feet well .I suffered by powercut.During powercut i got 2phase supply only .My question is can i run the pump in 2 phase supply using capacitor?.Can u explain me how to connect the capacitors?

2 Answers  


can we use ELCB and RCBO in one db

6 Answers  


What is purpose of reactor?.What is different between line and bus reactor?

0 Answers  


In 1000KVA Transformer why does we connect HT with delta connection and LT with star connection.Illustrate by showing formula?

4 Answers   Tata Motors,


Why the transformers are rated in kva?

11 Answers   Birla, NTPC, Reddy Labs, Vijai Electricals,


why we use core type and shell type transformers?

2 Answers  


what is (+) and (-) in generator field detector stand for?

0 Answers  


For a certain load i need 100kw load ,In that case what rating mccb should i use?

5 Answers  


why we short ckt the secondry vo5tage/ winding in transfr and motor?

2 Answers  


placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!

0 Answers  


how we calculate electrical load on a building according to area?

0 Answers   HFCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)